Selected projects from the TOP GEO Group portfolio

Geological exploration of the Chumek area

East Kazakhstan Region · 2020–2021

Integrated turnkey geological exploration

Client
LacusMining LLP

Uzen–Turkmenistan border railway

2009–2010

Surveying support, setting-out and georeferencing

Client
ADANI LLP

Centre–East corridor

Pavlodar–Semey section · 2013

Design, surveys and preparation of design and cost estimates

Client
KazAvtoZhol National Company JSC

Moynak Hydropower Plant and Bestyubinsk Reservoir

2024–2025

Drilling works for vertical filtration boreholes

Client
Alatau Engineering LTD LLP

Industrial silicon plant

Zhambyl Region · 2023

Construction of bored piles 600 mm in diameter

Client
StroyTsentr-EK LLP

Bridge over the Ural River

Makhambet village · 2014

Technical supervision of bridge construction

Client
Atyrau Region Passenger Transport and Roads Department

At work sites

TOP GEO field work

TOP GEO field work

Work list 2006–2026

Projects and types of work from the group’s list dated 6 August 2026.

  • Drilling works at the Pushuktau, Kiikbay, Mayskoye and Anomalnoye work areas in Karaganda Region
    Drilling and geological exploration works
  • Core drilling and geological support for drilling works, including core cutting and transport of samples to the laboratory
    Drilling and geological exploration works
  • Core drilling with core recovery at the Espetuz deposit, Bayanaul District, Pavlodar Region
    Drilling and geological exploration works
  • Drilling works at the Client’s sites
    Drilling and geological exploration works
  • Bored-pile drilling for the Promezhutochnaya station–Passing Loop 5 railway section: an overpass for agricultural machinery with the span arrangement 11.5+3×16.5+11.5 at chainage PK 633+11.50
    Piling works
  • Drilling vertical “positive” filtration boreholes at sites within the U. D. Kantaev Moynak Hydropower Plant and the Bestyubinskoye Reservoir
    Drilling and geological exploration works
  • Drilling a borehole to supply diesel fuel to the fuel and lubricants storage facility on level 10 of the Artemyevskaya Mine, Artemyevsky Production Complex, Vostok Tsvetmet LLP
    Drilling and geological exploration works
  • Bored-pile drilling for a refrigerated warehouse with a machinery room at 15 Akhrimenko Street, Petropavlovsk, North Kazakhstan Region
    Piling works
  • Drilling one well at least 280 m deep, with a yield of up to 50 m³/h, for domestic and industrial/process water supply in Talgar District, Almaty Region, and for the Beskainar Agricultural Production Cooperative
    Drilling and geological exploration works
  • Pile-drilling works for a refrigerated warehouse with a machinery room at 15 Akhrimenko Street, Petropavlovsk, North Kazakhstan Region
    Piling works
  • Drilling two wells 150 m deep, or up to 200 m if technically necessary, for industrial/process water supply at plot 12A, Borolday, Ili District, Almaty Region, Republic of Kazakhstan
    Drilling and geological exploration works
  • Construction and installation works at the Client’s facility at 12 Zheruyyk Street, Otegen Batyr, Ili District, Almaty Region, 040700
    Construction and installation works
  • Preparation of road design and cost-estimate documentation for the construction of external industrial engineering infrastructure for the Almaty Poultry Farm, with a meat-product capacity of up to 240,000 tonnes per year, in Zhambyl District, Almaty Region, Republic of Kazakhstan
    Engineering design
  • Preparation of design and cost-estimate documentation for two road bridges under the project to construct external industrial engineering infrastructure for the Almaty Poultry Farm, with a meat-product capacity of up to 240,000 tonnes per year, in Zhambyl District, Almaty Region, Republic of Kazakhstan: construction of two road bridges across the Kurty and Zhirenaygyr rivers
    Engineering design
  • Engineering geological surveys for the construction of a leisure area with a hotel and cottages (1 plot, 6.92 ha), Talgar District, Almaty Region, and the Beskainar Agricultural Production Cooperative
    Engineering surveys
  • Well drilling at the Client’s site at 12 Zheruyk Street, Otegen Batyr, Ili District, Almaty Region
    Drilling and geological exploration works
  • Preparation of a detailed design for a residential complex with a household-services building, an aparthotel and a public service centre, including external utility networks, in Pervomaysky Settlement District, Zhetysu District, Almaty (excluding cost-estimate documentation)
    Engineering design
  • Designer supervision of the overhaul of the overpass across railway tracks on the bypass road in Zhanakorgan, Zhanakorgan District, Kyzylorda Region
    Designer supervision
  • Designer supervision of the reconstruction of T. Aubakirov Street in Karkaralinsk
    Designer supervision
  • Drilling vertical “positive” filtration boreholes at sites within the U. D. Kantaev Moynak Hydropower Plant and the Bestyubinskoye Reservoir
    Drilling and geological exploration works
  • Project 1: construction of a pedestrian bridge over the railway at the intersection of G. Muratbayev and Yassawi streets in Kyzylorda; project 2: construction of a pedestrian bridge over the railway in Zhalagash, Zhalagash District, Kyzylorda Region
    Drilling and geological exploration works
  • Construction of a road bridge over the railway in Aralsk, Kyzylorda Region
    Engineering and construction works
  • Project 1: construction of a pedestrian bridge over the railway at the intersection of G. Muratbayev and Yassawi streets in Kyzylorda; project 2: construction of a pedestrian bridge over the railway in Zhalagash, Zhalagash District, Kyzylorda Region
    Drilling and geological exploration works
  • Rental of a Shantui SD23 bulldozer manufactured in 2012, registration number AUD 026A
    Equipment supply and rental
  • Bored-pile drilling for the construction of a residential house at plot 47, Aidarly, Medeu District, Almaty
    Piling works
  • Construction of a tobacco-products factory in Kokozek village, Karasay District, Almaty Region
    Engineering and construction works
  • Rental of mobile buildings
    Equipment supply and rental
  • Reconstruction of an existing building with an attached administrative wing in Astana
    Drilling and geological exploration works
  • Bored-pile drilling at the TsKS Kokterek site in Bayserke village, Ili District, Almaty Region
    Piling works
  • Drilling and concreting of bored piles for the construction of the ORDA TOWN residential complex near Abay village in Almaty
    Piling works
  • Drilling and concreting of bored piles for the Aksu Zhabagly rehabilitation and health complex in Tulkubas District, Turkestan Region
    Piling works
  • Bored-pile drilling for an apartment residential complex with integrated premises and parking in the Komsomolsky residential area, near the intersection of Bayan Sulu and Kyz Zhibek streets
    Piling works
  • Drilling 356 piles, 600 mm in diameter and up to 5.5 m deep, for an industrial silicon plant in Tasotkel village, Shu District, Zhambyl Region, Republic of Kazakhstan, in the Chemical Park Taraz special economic zone
    Piling works
  • Supply of drilling equipment
    Equipment supply and rental
  • Works for the construction of a public-services building at 26 Akzhazyk Street, Ulzhan-1 neighbourhood, Alatau District (Ulzhan, house 196)
    Engineering and construction works
  • Repairs to asphalt surfacing and stormwater drainage
    Engineering and construction works
  • Comprehensive geological exploration at the Chumek prospective area in East Kazakhstan Region
    Geological exploration works
  • Technical supervision of medium repairs to the A-8 Taskesken–Bakhty (Chinese border) national road in East Kazakhstan Region, km 166–181
    Technical supervision
  • Technical supervision of medium repairs to the M-38 Russian border (towards Omsk)–Maykapshagay national road, km 284–526, including livestock fencing on selected sections totalling 16.0 km
    Technical supervision
  • Technical supervision of medium repairs to the P-4 Nur-Sultan–Ereymentau–Shiderty national road, km 201.2–230.5, including livestock fencing on selected sections: 16.0 (unit not specified in the source)
    Technical supervision
  • Technical supervision of the construction of the Teremki multifunctional residential complex with integrated infrastructure at 51 Seifullin Avenue and 99 Budenny Street, Turksib District, Almaty; internal access roads; revision
    Technical supervision
  • Preparation of design and cost-estimate documentation with expert review for the overhaul of 5.5 km of road on K. Amanzholov Street
    Engineering design
  • Preparation of design and cost-estimate documentation with expert review for the overhaul of T. Aubakirov Street in Karkaralinsk
    Engineering design
  • Technological design works, including preparation of the technological sections of transport construction designs; preparation of cost estimates for medium road repairs
    Engineering design
  • Technical supervision of medium repairs to the A-11 Semey–Russian border national road, km 2+200–18
    Technical supervision
  • Technical supervision of medium repairs to the A-20 Karaganda–Ayagoz–Tarbagatay–Bugaz national road, km 747–757
    Technical supervision
  • Technical supervision of medium repairs to the P-23 Semey–Kaynar national road, km 47+500–51
    Technical supervision
  • Drilling to determine the geological section for the construction of the 3-storey Zhanuya residential building in Koksay village, Irgeli Rural District, Karasay District, Almaty Region
    Drilling and geological exploration works
  • Drilling and concreting of boreholes for bored piles for a residential complex with integrated premises, a kindergarten and parking at plot 13, E 10 Street, Yesil District, Astana
    Piling works
  • Reconstruction of the heating main in Nur-Sultan from 4 Kudayberdyuly Street to 3 Abylaykhan Street
    Engineering and construction works
  • Bored-pile drilling for the construction of the Kokzhaylau 2 residential complex at 50/3 Tolemetov Street, Shymkent
    Piling works
  • Supply of a modular bathhouse building based on a 40-foot container and a modular water-treatment station (pump house) based on a 40-foot container
    Equipment supply and rental
  • Bored-pile drilling for the construction of a house on Zhamakayev Street, Almaty
    Piling works
  • Supply of drilling equipment
    Equipment supply and rental
  • Bored-pile drilling for a service road on land plots at 292/1 Zhamakayev Street and plot 3245 of the Gorny Gigant cooperative (PK), Almaty
    Piling works
  • A rotational workers’ camp comprising 14 residential modules and utility-support modules in Boke village, Zharma District, East Kazakhstan Region
    Engineering and construction works
  • Drilling and concreting of bored piles for a low-rise residential complex at the intersection of Uzak Batyr and Umbetey Zhyrau streets, Yesil District, Astana
    Piling works
  • Drilling of geological exploration boreholes
    Drilling and geological exploration works
  • A package of drilling works for groundwater drawdown
    Drilling and geological exploration works
  • Desk-based data processing works
    Desk-based data processing
  • Comprehensive geological exploration at the Chumek prospective area in East Kazakhstan Region
    Geological exploration works
  • Drilling and mining works at the Aleksandrovskoye copper–zinc deposit in East Kazakhstan Region
    Drilling and geological exploration works
  • Drilling works at the Quzhal lead–zinc deposit in Karaganda Region
    Drilling and geological exploration works
  • Bored-pile drilling for a detached residential house at 460/2 and 461 Zhanaru, Bostandyk District, Almaty
    Piling works
  • Supply of a modular canteen building with furniture and utilities equipment, assembled from 4 (four) 20-tonne containers, and 1 (one) toilet unit made from a 5-tonne container
    Equipment supply and rental
  • Geophysical investigations in production wells in accordance with the Client’s design and cost-estimate documentation for prospecting and exploration to establish groundwater reserves for villages in Enbekshikazakh, Talgar, Raiymbek, Balkhash, Kerbulak, Panfilov and Uygur districts
    Drilling and geological exploration works
  • Drilling works at the Samarskoye hard-coal deposit in Central Kazakhstan Region
    Drilling and geological exploration works
  • Drilling works at the Bugaty deposit, Enbekshikazakh District, Almaty Region
    Drilling and geological exploration works
  • Engineering geological surveys for the construction of a 9-storey residential building with integrated service facilities in neighbourhood 1, east of Sain Street and north of Ulugbek Street, Auezov District, Almaty
    Engineering surveys
  • Geological exploration at the Chumek prospective area in East Kazakhstan Region
    Geological exploration works
  • Engineering geological surveys for a petroleum-products storage facility at 29B Stepnaya Street, Pokrovka, Energetichesky Rural District, Ili District, Almaty Region
    Engineering surveys
  • Comprehensive geological exploration works
    Geological exploration works
  • Geological support services for drilling near Zhanatas, Zhambyl Region
    Drilling and geological exploration works
  • Engineering geological surveys for a land plot at 105/5 Observatoriya Street, Medeu District, Almaty
    Engineering surveys
  • Comprehensive geological exploration works providing geological support services for exploration drilling
    Drilling and geological exploration works
  • Geological support services for exploration drilling under licences No. 170-EL dated 19.07.2019; 171-EL dated 19.07.2019; b/p – Central Akdzhar; 172-EL dated 19.07.2019; 651-EL dated 12.06.2020; 602-EL dated 17.03.2020; 639-EL dated 26.05.2020; and 680-EL dated 10.07.2020, near Zhanatas, Zhambyl Region
    Drilling and geological exploration works
  • Geological exploration works providing geological support services for exploration drilling at Central Akdzhar, near Zhanatas, Zhambyl Region
    Drilling and geological exploration works
  • Contract for technical and economic calculations as part of geological exploration works
    Geological exploration works
  • Engineering geological surveys for an industrial greenhouse complex on the land of AKKh Zhetysu, Karasay District, Almaty Region
    Engineering surveys
  • Engineering geological surveys for a feasibility study and conceptual design for a sustainable road-maintenance project on km 377–416 of the M-36 Russian border (towards Yekaterinburg)–Almaty road in Kostanay Region
    Engineering surveys
  • Core drilling in the reserve-expansion area of the Kazger 1 deposit in Akmola Region
    Engineering and construction works
  • Comprehensive topographic surveying for exploration under Contract No. 4535 dated 04.02.2015 in Karaganda Region
    Engineering and construction works
  • Geological exploration at the Chumek prospective area in East Kazakhstan Region
    Geological exploration works
  • Drilling for engineering geological surveys for the beneficiation plant at the Bugaty deposit, Enbekshikazakh District, Almaty Region
    Drilling and geological exploration works
  • Core drilling in the reserve-expansion area of the Altynbay-2 deposit
    Engineering and construction works
  • Drilling for engineering geological surveys at the Client’s sites in the Republic of Kazakhstan
    Drilling and geological exploration works
  • Drilling works for water supply to rotational workers’ camps in Almaty Region
    Drilling and geological exploration works
  • Topographic, geodetic and engineering geological surveys for the expansion of the Alatau Kus poultry farm in Chapaevo, Almaty Region
    Engineering surveys
  • Topographic, geodetic and engineering geological surveys for the overhaul of the bridge over the Ashchisu River at km 111+70 of the Semey–Kaynar road in East Kazakhstan Region
    Engineering surveys
  • Topographic, geodetic and engineering geological surveys for the preparation of design and cost-estimate documentation for the overhaul of the Saryozek–Koktal road, km 45–68, Almaty Region
    Engineering surveys
  • Drilling works for the New Transport System of Astana, LTR, phase 1
    Drilling and geological exploration works
  • Supply of 4 residential containers
    Equipment supply and rental
  • Topographic, geodetic and engineering geological surveys for an oat-processing workshop building in Pokrovka village, Atbasar District, Akmola Region
    Engineering surveys
  • Geodetic support, geological well-drilling works and geodetic setting-out for a 100 MW solar substation in Kapshagay, Almaty Region
    Drilling and geological exploration works
  • Geodetic works within Almaty
    Engineering and construction works
  • Works for the reconstruction of the Republican Scientific Centre of Neurosurgery building, with an extension to accommodate a gamma-therapy complex and magnetic resonance imaging, at 34/1 Turan Avenue, Yesil District, Astana
    Engineering design
  • Drilling three wells at a site in Bayanaul District, Pavlodar Region
    Drilling and geological exploration works
  • Purchase, delivery and installation of a wind-powered pump for a well at a site in Pavlodar Region
    Equipment supply and installation
  • Drilling a 30 m deep water-abstraction well at a site in Bayanaul District, Pavlodar Region
    Drilling and geological exploration works
  • Drilling a 42 m deep water-abstraction well at a site in Kurkelin Rural District, Pavlodar Region
    Drilling and geological exploration works
  • Drilling a 42 m deep water-abstraction well at a site in Shoptykol Rural District, Pavlodar Region
    Drilling and geological exploration works
  • Drilling a water-abstraction well at a site in Pavlodar Region
    Drilling and geological exploration works
  • Drilling a water-abstraction well of unspecified depth at a site in Uzunbulak Rural District, Pavlodar Region
    Drilling and geological exploration works
  • Drilling a 30 m deep water-abstraction well at a site in Karashi village, Bayanaul District, Pavlodar Region
    Drilling and geological exploration works
  • Drilling a 51 m deep water-abstraction well at a site in Toraigyr Rural District, Bayanaul District, Pavlodar Region
    Drilling and geological exploration works
  • Drilling a water-abstraction well at a site in Toraigyr Rural District, Bayanaul District, Pavlodar Region
    Drilling and geological exploration works
  • Drilling a 42 m deep water-abstraction well at a site in Kundykol Rural District, Bayanaul District, Pavlodar Region
    Drilling and geological exploration works
  • Drilling a 45 m deep water-abstraction well at a site in Toraigyr Rural District, Bayanaul District, Pavlodar Region
    Drilling and geological exploration works
  • Engineering geological surveys for the construction of an apartment residential complex on Kurylysshi Street, neighbourhood 18, Kapshagay, Almaty Region
    Engineering geological surveys
  • Engineering geological and topographic/geodetic works for design and cost-estimate documentation for the reconstruction of: 1. the bridge over the Aksay River on the central street of the Edelweiss association (s/o), Tauzholy neighbourhood; 2. the bridge over the Aksay River on Zhandosov Street; 3. the bridge over the Kargaly River on Tazhiyev Street, Karagayly neighbourhood
    Engineering geological surveys
  • Drilling works at the Takyr-Kaldzhir deposit in East Kazakhstan Region
    Drilling and geological exploration works
  • Designer supervision of a shopping and entertainment complex with public-service facilities at plot 31/1, Osipenko Street, Turksib District, Almaty
    Designer supervision
  • Designer supervision of the conversion of an apartment into a bakery with a prepared-food shop and an entrance extension at apartment 22, 86 Nurmakov Street, Almaty
    Designer supervision
  • Designer supervision of the reconstruction of the Centre–South Astana–Karaganda–Balkhash–Kapshagay–Almaty corridor, km 2214–2295 of the Russian border (towards Yekaterinburg)–Almaty national road
    Designer supervision
  • Engineering geological surveys for the construction of an amusement ride within Medeu National Park
    Engineering surveys
  • Technical supervision of a multi-apartment residential complex with built-in premises and parking in the Yesil District of Astana, near the intersection of E126 and E435 streets
    Technical supervision
  • Engineering geological surveys for lake shore improvement in the Kolsay forestry district, covering 0.80 ha
    Engineering surveys
  • Works and services under public procurement
    Engineering and construction works
  • Purchase, delivery and installation of a VNO-1 wind pump on a well at a site in Bayanaul District, Pavlodar Region
    Equipment supply and installation
  • Engineering geodetic works: topographic surveying at a scale of 1:2000 for settlement master plans and detailed planning projects in Almaty Region, covering Kokzhazyk, Syrymbet, Karatalsk and Zhetysu villages in Eskeldy District
    Topographic surveying, 2015
  • Engineering geodetic works: topographic surveying at a scale of 1:2000 for settlement master plans and detailed planning projects in Almaty Region, covering Zhalpaksay village in Karasay District
    Topographic surveying, 2015
  • Engineering geodetic works: topographic surveying at a scale of 1:2000 for settlement master plans and detailed planning projects in Almaty Region, covering Matay village in Aksu District
    Topographic surveying, 2015
  • Technical supervision of the overhaul of Shemyakin Street from Ryskulov Avenue to Maylin Street, 3.303 km
    Technical supervision, 2015
  • Designer supervision of the reconstruction of the Centre–East corridor, Astana–Pavlodar–Kalbatau–Ust-Kamenogorsk, on the Pavlodar–Semey road section at km 419–432
    Designer supervision
  • Designer supervision of the construction of a pedestrian overpass on Shalyapin Street (School-Gymnasium No. 176); designer supervision of the construction of a pedestrian overpass at Ryskulov Avenue and Dospanov Street (Akbulak neighbourhood)
    Designer supervision
  • Technical supervision of a multi-apartment residential complex with built-in premises and parking in the Yesil District of Astana, near the intersection of E126 and E435 streets
    Technical supervision
  • Engineering geological surveys for lake shore improvement in the Kolsay forestry district, covering 0.80 ha
    Engineering geological surveys
  • Construction of a bridge crossing over the Ural River in Makhambet village, Makhambet District
    Technical supervision, 2014
  • Reconstruction of the national road Russian Federation border (towards Samara)–Shymkent via Uralsk, Aktobe and Kyzylorda, km 1980–2012
    Revision of design and cost-estimate documentation, 2014
  • Reconstruction of the national road Russian Federation border (towards Samara)–Shymkent via Uralsk, Aktobe and Kyzylorda, km 1917–1948
    Revision of design and cost-estimate documentation, 2014
  • Reconstruction of the national road Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez, km 310.5–358.6
    Revision of design and cost-estimate documentation, 2014
  • Reconstruction of the national road Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez, km 358.6–389.4
    Revision of design and cost-estimate documentation, 2014
  • Reconstruction of the national road Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez, km 261.5–310.5
    Revision of design and cost-estimate documentation, 2014
  • Reconstruction of the national road Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez, km 383–404
    Revision of design and cost-estimate documentation, 2014
  • Revision of design and cost-estimate documentation for reconstruction of the Centre–South corridor, Astana–Karaganda–Balkhash–Kapshagay–Almaty, on the Russian Federation border (towards Yekaterinburg)–Almaty road section at km 2214–2295
    Revision of design and cost-estimate documentation, 2014
  • Preparation of design and cost-estimate documentation, surveys and state expert review for construction of the district road Raiym–Vodokachka (Zhetes Bi), km 0–10, in Aral District
    Preparation of design and cost-estimate documentation, 2014
  • Technical supervision of the reconstruction of the Almaty–Kapshagay corridor on the Almaty–Kapshagay road, km 14–118, covering the section at km 45–77
    Technical supervision, 2014
  • Engineering geodetic works: topographic surveying at a scale of 1:1000 for a detailed planning project for Usharal, Alakol District, Almaty Region
    Topographic surveying, 2014
  • Topographic surveying of newly incorporated areas: Alatau neighbourhood, Magnum shopping centre, Tauzholy village and Tastybulak village
    Topographic surveying, 2014
  • Topographic surveying of newly incorporated areas: Pervomayka settlement, Rakhat village and Madiniet village
    Topographic surveying, 2014
  • Topographic surveying of newly incorporated areas: Yermensay-2 village and Kolsay village
    Topographic surveying, 2014
  • Preparation of design and cost-estimate documentation for construction of a pedestrian crossing on Shalyapin Street (School-Gymnasium No. 176)
    Preparation of design and cost-estimate documentation, 2014
  • Preparation of design and cost-estimate documentation for pedestrian crossings: Lot No. 7, Ryskulov Avenue–Dospanov Street (Akbulak neighbourhood); Lot No. 12, Suyunbay Avenue–Sidorenkin Street; Lot No. 13, Suyunbay Avenue–Gromov Street
    Preparation of design and cost-estimate documentation, 2014
  • Preparation of design and cost-estimate documentation with state expert review for the overhaul of the Almaty–Zhetigen–Kapshagay Reservoir road, km 33–35, Ili District, Almaty Region
    Preparation of design and cost-estimate documentation, 2014
  • Preparation of design and cost-estimate documentation for construction of a 7.0 km road in the Zhas Kanat neighbourhood
    Preparation of design and cost-estimate documentation, 2014
  • Construction of a plant producing electric-welded longitudinal-seam oil and gas pipeline pipes, 508–1422 mm in diameter and 8.0–33.0 mm in wall thickness, with external and internal anti-corrosion coatings
    Engineering geological and engineering geodetic surveys, 2013
  • Construction of the Zheruyyk ethnopark in Astana
    Engineering geological and engineering geodetic surveys for preparation of the project’s feasibility study, 2013
  • Preparation of design and cost-estimate documentation for a farm building in Alatau Rural District, Talgar District, Almaty Region
    Engineering geological surveys, 2013
  • Geodetic works for inter-farm land management and establishment of new boundaries for Almaty
    Engineering geodetic surveys, 2013
  • Construction of a plant producing electric-welded longitudinal-seam oil and gas pipeline pipes, 508–1422 mm in diameter and 8.0–33.0 mm in wall thickness, with external and internal anti-corrosion coatings
    Engineering geological surveys, 2013
  • Construction of the West–North–Centre trunk gas pipeline: routes of pipeline branches to automated gas distribution stations AGRS-15 and AGRS-16
    Engineering geological surveys, 2013
  • Preparation of design and cost-estimate documentation for construction of a greenhouse complex in Karasay District, Almaty Region, cadastral number 03-047-0580543
    Engineering geological surveys, 2013
  • Reconstruction of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road section at km 310–358
    Engineering geodetic surveys, 2013
  • Preparation of design and cost-estimate documentation for creation and reconstruction of public gardens in Astana
    Engineering geological surveys, 2013
  • Preparation of design and cost-estimate documentation for an 18 km industrial access road from a cement plant to a quarry in Moyynkum District, Zhambyl Region
    Engineering geological and engineering geodetic surveys, 2013
  • Preparation of design and cost-estimate documentation for construction of double-track sections on the Kunshagir–Utrabad, Akshokat–Timur and Timur–Passing Loop No. 37 sections
    Engineering geological and engineering geodetic surveys, 2013
  • Reconstruction of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road section at km 483–536 in Zhambyl Region
    Geodetic works, 2013
  • Design, supply and construction of maintenance and operating facilities and rotation camps: Saksaulsk maintenance and operating facility and rotation camp (km 518); Aksuat maintenance and operating facility and rotation camp (km 725)
    Engineering geological surveys, 2013
  • Installation of a system for monitoring compliance with permitted vehicle weight limits and recording traffic volumes
    Engineering geological surveys, 2013
  • Preparation of design and cost-estimate documentation for pedestrian crossings in Almaty
    Engineering geological surveys, 2013
  • Construction of a 2000-seat amphitheatre in Astana’s city park of culture and recreation
    Engineering geological surveys, 2013
  • Preparation of a master plan for Rudny at a scale of 1:2000
    Topographic surveying, 2013
  • Preparation of a master plan for Masanchi village, Korday District, Zhambyl Region
    Topographic surveying, 2013
  • Construction of the Taraz bypass section at km 483–536 of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road in Zhambyl Region
    Calculation of work quantities, 2013
  • Construction of a railway wagon maintenance facility at Astana Station
    Engineering geological surveys, 2013
  • Reconstruction of Kabanbay Batyr Street from the Tranzit filling station to the road bridge in Ayagoz, East Kazakhstan Region, 4.6 km
    Engineering geological surveys, 2013
  • Preparation of design and cost-estimate documentation for the overhaul of streets in Ayagoz, East Kazakhstan Region
    Engineering geological and engineering geodetic surveys, 2013
  • Construction of a gas supply pipeline to Komsomol village, Ayteke Bi District, Aktobe Region
    Engineering geological and engineering geodetic surveys, 2013
  • Preparation of design and cost-estimate documentation for reconstruction of the national road Uralsk–Kamenka–Russian Federation border (towards Ozinki), km 4–104
    Engineering geological and engineering geodetic surveys, 2013
  • A glyphosate plant with an annual capacity of 10 000 tonnes in the Taraz Chemical Park Special Economic Zone, Shu District, Zhambyl Region
    Engineering geological surveys, 2013
  • Preparation of design and cost-estimate documentation and submission for state expert review of the KS-4 access road construction project in T. Ryskulov District, Zhambyl Region
    Preparation of design and cost-estimate documentation, 2013
  • Preparation of design and cost-estimate documentation for road overhaul on Seyullin Street from Abay Boulevard to Ualikhanov Street, and on Nuralinov Street from Aktamberdy Street to Kabanbay Batyr Street in Ayagoz, East Kazakhstan Region
    Engineering geological and engineering geodetic surveys, 2013
  • Construction of a 600-place secondary school in Bayserke village, Ili District, Almaty Region
    Technical supervision, 2013
  • Construction of a 600-place secondary school in Ushkonyr village, Karasay District, Almaty Region
    Technological support, 2013
  • Technical supervision of the reconstruction of traffic signal installations and telephone communication lines
    Technical supervision, 2013
  • Preparation of design and cost-estimate documentation for the overhaul of the national road Kokpek–Kegen–Tyup–Zhalanash–Satty–Kurmetty–access to Lake Kolsay, km 43–78
    Preparation of design and cost-estimate documentation, 2013
  • Reconstruction of the Saryozek–Khorgos–Kogaly–Koksu–Karabulak road, km 58–94, Kerbulak District, Almaty Region
    Technical supervision, 2013
  • Road construction: technical supervision of the 1.9 km extension of Suyunbay Avenue from Sholokhov Street to Bekmakhanov Street, with a flyover across railway tracks
    Technical supervision, 2013
  • Preparation of design and cost-estimate documentation for reconstruction of the Centre–East corridor, Astana–Pavlodar–Kalbatau–Ust-Kamenogorsk, on the Pavlodar–Semey road section at km 419–432
    Preparation of design and cost-estimate documentation, 2013
  • Construction of on-site utility networks in Penzhim settlement at Altynkol Station, Panfilov District, Almaty Region
    Setting-out, positioning and geodetic support, 2012
  • Construction of the KTZ Training Centre in Astana
    Setting-out and positioning works, 2012
  • Reconstruction of the Samara–Shymkent road section at km 2135–2183, South Kazakhstan Region
    Setting-out, positioning and geodetic support, 2012
  • Road construction in the Almaly, Bostandyk and Medeu districts of Almaty
    Technical supervision, 2012
  • Overhaul of Municipal State Treasury Enterprise Nursery-Kindergarten No. 99 in Almaty
    Technical supervision, 2012
  • Works on a land plot in the Zhetigen site, Kaynar Rural District, Talgar District, Almaty Region, cadastral numbers 03-051-225-357 and 03-051-213-147
    Setting-out, positioning and geodetic support, 2012
  • Construction of the West–North–Centre trunk gas pipeline in Akmola, Kostanay and North Kazakhstan regions, on route section GEO5 from km 736.3 to km 932.8, with a section length of 196.5 km
    Engineering geological surveys for preparation of design and cost-estimate documentation, 2012
  • Lowering groundwater levels in Zhalpaksay village and at Shemolgan Station; clearing the channels of the Kaskelen and Ushkonyr rivers; restoring and clearing access roads to the Maralsay tract, Kargaly village and the Ushkonyr tract in Karasay District, Almaty Region
    Preparation of design and cost-estimate documentation, 2012
  • Reconstruction of the Taraz–Korday road section at km 261.5–310.5, Zhambyl Region
    Geodetic works, 2012
  • A-15 road Zhizzak–Gagarin–Zhetysay–Kirovsky–Kyzylasker–Abay–Saryagash–Zhibek Zholy, km 74–220, with a length of 146 km, South Kazakhstan Region
    Engineering geological and engineering geodetic surveys, 2012
  • Pedestrian underpass on Sain Street, south of Ulugbek Street, Almaty
    Preparation of design and cost-estimate documentation, 2012
  • Geodetic works for the project: reconstruction of the road section at km 310.5–358.6
    Setting-out, positioning and geodetic support, 2012
  • Overhaul of the Almaty–Tashkent–Termez road, access to the town of ADK, km 0–7, Karasay District, Almaty Region
    Engineering geological and engineering geodetic surveys, 2012
  • Preparation of a detailed design for construction of pedestrian overpasses and a bridge over the Kargaly River on Raiymbek Avenue, Almaty
    Engineering geological works, 2012
  • Installation of a 102 km fibre-optic communication line from Kyzylzhar settlement to Shubarkol settlement, Karaganda Region
    Engineering topographic, geodetic and geological surveys, 2012
  • Technical supervision of 85 streets in Almaty
    Technical supervision, 2012
  • Technical supervision of construction of traffic signal installations and signal-controlled pedestrian crossings, and reconstruction of traffic signal installations and telephone communication lines in Almaty
    Technical supervision, 2012
  • Geodetic setting-out and positioning for construction of the ORBITA Computing Centre in Akkol, Akmola
    Geodetic works, 2012
  • General geological work on a “grid” and detailed site layout for construction of the West–North–Centre trunk gas pipeline
    Geological surveys, 2012
  • Verification of geodetic points for the Arkalyk–Shubarkol railway line construction project
    Geodetic works, 2012
  • Engineering surveys for sites in Almaty Region
    Engineering geological and engineering geodetic surveys, 2012
  • Engineering surveys for detailed designs: preparation of design and cost-estimate documentation for the overhaul of a bridge on the KKh-8 road Republic of Uzbekistan border–Shardara–Arys–Temirlan–M-32, at km 209+480 in Arys
    Geodetic works, 2012
  • Russian Federation border (towards Yekaterinburg)–Almaty road, Astana–Temirtau section, km 1051–1220
    Engineering geological and engineering geodetic surveys, 2012
  • Construction of a cement plant in Akmola Region
    Setting-out, positioning and geodetic support, 2011
  • Reconstruction of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road section at km 310.5–358.6 to category 1B, Zhambyl Region
    Setting-out, positioning and geodetic support, 2011
  • Reconstruction of a section of the Samara–Shymkent road, 24.606 km, South Kazakhstan Region
    Topographic surveying, setting-out and positioning, preparation of longitudinal and cross-section drawings of the route, and quantity calculations, 2011
  • Reconstruction of the Samara–Shymkent road section at km 2135–2183, South Kazakhstan Region
    Topographic surveying, setting-out and positioning, preparation of longitudinal and cross-section drawings of the route, and quantity calculations, 2011
  • Reconstruction of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road section at km 443–483 to category 1B, Zhambyl Region
    Setting-out, positioning and geodetic support, 2011
  • Reconstruction of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road section at km 310.5–358.6 to category 1B, Zhambyl Region
    Quantity calculations for consistency with the consolidated schedule of work quantities, 2011
  • Reconstruction of the Samara–Shymkent road section at km 2135–2183, South Kazakhstan Region
    Setting-out, positioning and geodetic support, 2011
  • Medium repairs to the access road to the Abay dachas in Raiymbek Rural District and to Merey Street in Irgeli village, Irgeli Rural District, Karasay District, Almaty Region
    Preparation of design and cost-estimate documentation, 2011
  • Medium repairs and construction of roads in Almaty
    Technical supervision, 2011
  • Construction of on-site utility networks in Penzhim settlement at Altynkol Station, Panfilov District, Almaty Region
    Setting-out, positioning and geodetic support, 2011
  • Road construction in the Novostroyka neighbourhood, Almaty
    Preparation of design and cost-estimate documentation, 2011
  • Construction of water intake facilities at the Kulandy mine site, Sozak District, South Kazakhstan Region
    Setting-out, positioning and geodetic support, 2011
  • Asphalt paving of the access road to the trunk pipeline and construction of a connection to the southern road branch at the Kashagan field, Atyrau Region
    Preparation of design and cost-estimate documentation, 2011
  • Stabilisation of dust-generating ash disposal surfaces at Ekibastuz GRES-2 Power Station JSC in Ekibastuz, Pavlodar Region
    Design revision, 2011
  • Medium repairs to two streets in Aksay Rural District, two in Eltay Rural District, four in Karagayly Rural District, five in Kaskelen Urban District, one in Novoshamalgan Rural District, four in Raiymbek Rural District, two in Umtyl Rural District and two in Ushkonyr Rural District, Karasay District, Almaty Region
    Preparation of design and cost-estimate documentation with state expert review, 2011
  • Bridge construction design for a crossing over the Shu River on the Zhuantobe–PV 19 road, South Kazakhstan Region
    Engineering geological surveys, 2011
  • Construction of a small bridge over the Pikhtovka River from PK 107+44.76 to PK 108+19.98 and four culverts under the national road reconstruction project Ust-Kamenogorsk–Zyryanovsk–Bolshenarymskoye–Katon-Karagay–Rakhmanovskiye Klyuchi, East Kazakhstan Region
    Engineering geological and engineering geodetic surveys, 2011
  • Off-site utility networks and facilities for the temporary Bozshalokol mining and processing complex, Pavlodar Region
    Setting-out, positioning and geodetic support, 2011
  • Construction of the Uzen–state border with Turkmenistan railway line, Taygyr Passing Loop–Bolashak Station section, Mangystau Region
    Setting-out, positioning and geodetic support, 2010
  • Construction of an underground tunnel at km 406 of the Almaty–Astana road for transporting cement raw materials from the quarry to the plant, Zhambyl Region
    Setting-out, positioning and geodetic support, 2010
  • Reconstruction of the Russian Federation border–Shymkent road sections at km 1650–1702 and km 1752–1807, South Kazakhstan Region
    Establishment of new geodetic control network points and verification of existing points, 2010
  • Medium repairs to roads in Almaty
    Technical supervision, 2010
  • Tests to determine deformation and horizontal displacement of the Shardara Hydropower Plant building and the right-bank slope, South Kazakhstan Region
    Topographic surveying and tests to determine deformation and horizontal displacement, 2010
  • Restoration of boreholes and piezometers at Shardara Hydropower Plant, South Kazakhstan Region
    Engineering geological surveys, 2010
  • Construction of treatment facilities for the cement plant in Mynaral settlement, Almaty Region
    Setting-out, positioning and geodetic support, 2010
  • Medium repairs to roads in the Medeu District of Almaty
    Technical supervision, 2010
  • Expansion of water intake well cluster 5V at the Almaty groundwater deposit for water supply to the Algabas neighbourhood, construction phases 2, 3 and 4, Almaty
    Determination of the soil foundation compaction coefficient through field and laboratory testing, 2010
  • Engineering geological works at sites across Almaty Region
    Engineering geological surveys, 2010
  • Creation of a backup ground-based spacecraft control complex and a communications monitoring system in Almaty
    Preparation of design and cost-estimate documentation, 2010
  • Topographic and geodetic surveying at CHP-2, covering 10 ha, Almaty
    Topographic and geodetic surveying, 2010
  • Development of road infrastructure for the first satellite city, Gate City, Phase I, Almaty Region
    Engineering geodetic and engineering geological surveys, 2010
  • Reconstruction of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road section at km 310.5–358.6 to category 1B, Zhambyl Region
    Laboratory and engineering works, 2010
  • Reconstruction of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road section at km 443–483 to category 1B, Zhambyl Region
    Setting-out, positioning and geodetic support, 2010
  • Reconstruction of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road section at km 443–483 to category 1B, Zhambyl Region
    Topographic surveying, setting-out and positioning, preparation of longitudinal and cross-section drawings of the route, and quantity calculations, 2010
  • Reconstruction of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road section at km 310.5–358.6 to category 1B, Zhambyl Region
    Topographic surveying, setting-out and positioning, preparation of longitudinal and cross-section drawings of the route, and quantity calculations, 2010
  • Reconstruction of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road section at km 310.5–358.6 to category 1B, Zhambyl Region
    Setting-out, positioning and geodetic support, 2010
  • Construction of three pedestrian overpasses on Sain Street, Almaty
    Preparation of design and cost-estimate documentation with state expert review, 2010
  • Construction of a road from Zhamakayev Street to Ospanov Street, Almaty
    Preparation of design and cost-estimate documentation with state expert review, 2010
  • Construction of the client’s facilities for the project “Industrial processing of the Semizbay uranium deposit — industrial site”, Akmola Region
    Setting-out, positioning and geodetic support, 2009
  • Construction of the client’s facilities at the Kharasan-2 site, Kyzylorda Region
    Setting-out, positioning and geodetic support, 2009
  • Power supply for the Vostochny neighbourhood in Kapchagay, Almaty Region
    Engineering geological surveys, 2009
  • Construction of roads and access streets for Gate City Phase 1 under the project “Construction of four satellite cities of Almaty”, Almaty Region
    Topographic, geodetic and engineering geological surveys and preparation of design and cost-estimate documentation, 2009
  • Construction of a 14 km water main supplying the Algabas neighbourhood, Almaty
    Engineering geological surveys, 2009
  • Road overhaul in Almaty: Talgar Road from Khaliullin Street to the city boundary, and the Almaty–Kokpek–Chundzha–Koktal–Khorgos road from Khaliullin Street to Guldala settlement
    Preparation of design and cost-estimate documentation, 2009
  • Preparation of design and cost-estimate documentation for street extensions in Almaty
    Engineering survey works, 2009
  • Construction of a cement plant in Akmola Region
    Setting-out, positioning and geodetic support, 2009
  • Medium repairs to roads in the Turksib, Zhetysu and Medeu districts of Almaty
    Technical supervision, 2009
  • Preparation of design and cost-estimate documentation for road construction in Almaty: roads in the Darkhan neighbourhood, extension of Zhubanov Street, and extension of Abay Street from BAK to the Almaty–Chemolgan road
    Engineering geological surveys, 2009
  • Almaty: road construction in the Ulzhan-1 and Kalkaman-3 neighbourhoods
    Technical supervision, 2009
  • Construction of an underground tunnel at km 406 of the Almaty–Astana road for transporting cement raw materials from the quarry to the plant, Zhambyl Region
    Preparation of design and cost-estimate documentation, 2009
  • Construction of the Uzen–state border with Turkmenistan railway line, Taygyr Passing Loop–Bolashak Station section, Mangystau Region
    Geodetic setting-out and georeferencing works, 2009
  • Construction of the Uzen–state border with Turkmenistan railway line, Taygyr Passing Loop–Bolashak Station section, Mangystau Region
    Setting-out, positioning and geodetic support, 2010
  • Almaty: medium road repairs in Medeu District
    Preparation of a cost estimate, 2009
  • Akmola Region: design work for 2.4 km of ski and biathlon trails in Shchuchinsk
    Design work, 2009
  • South Kazakhstan Region: construction of the Client’s facilities at the Zapadny site of the Mynkuduk deposit
    Setting-out and georeferencing works and geodetic support, 2008
  • Construction of the client’s facilities for the project “Industrial processing of the Semizbay uranium deposit — industrial site”, Akmola Region
    Setting-out and georeferencing works and geodetic support, 2008
  • Almaty: planimetric and elevation (vertical) surveying of the area within the building lines to enable design work in the Shanyrak-1 neighbourhood
    Engineering geodetic surveys, 2008
  • Almaty: overhaul of Tole Bi Street, from Zharokov Street to Momyshuly Street
    Engineering geodetic surveys, 2008
  • Almaty: overhaul of Abay Street, from Bayzakov Street to Sain Street
    Engineering geodetic surveys, 2008
  • Karaganda Region: reconstruction of industrial infrastructure within the contract area of the Kumkol deposit in Ulytau District
    Engineering geodetic surveys, 2008
  • South Kazakhstan Region: reconstruction of the Russian border–Shymkent road, km 1398–1578
    Engineering geodetic surveys, 2008
  • Almaty Region: construction of the Kaskelen–Lime Plant road
    Setting-out and georeferencing works and geodetic support, 2008
  • Almaty: overhaul of the 0.57 km access road to the Bobek health centre from Askarov Street
    Preparation of a detailed design, 2008
  • Kyzylorda Region: topographic surveying of the 600 ha Kharasan 2 site at the North Kharasan deposit
    Engineering geodetic surveys, 2008
  • Construction of a cement plant in Akmola Region
    Setting-out and georeferencing works and geodetic support, 2008
  • Almaty Region: overhaul of the Esik–Kyrbaltabay–Zhetygen road, km 0–48
    Engineering geodetic surveys, 2008
  • Akmola Region: reconstruction of the access road to the Semizbay deposit
    Topographic and geodetic surveys, preparation of working drawings for quantity calculations and documentation, 2008
  • Almaty Region: topographic surveying of 96 ha at the Almatinka and Nizhnyaya Avatskaya poultry farms in Pervomaysky, Ili District
    Topographic surveying, 2008
  • South Kazakhstan Region: reconstruction of the Russian border–Shymkent road, km 1398–1578
    Engineering geodetic surveys and establishment of a geodetic control network, 2008
  • Almaty Region: overhaul of the Esik–Kyrbaltabay–Zhetygen road, km 0–48
    Engineering geological surveys, 2008
  • South Kazakhstan Region: reconstruction of the Russian border–Shymkent road, km 1398–1578
    Engineering geological surveys, 2008
  • Almaty Region: overhaul of the Sunkar–Kanshengil–Topar–Kuygan road, km 233–234,236; the access road to Shamalgan village, km 0–2.3; and the overpass at km 264 of the Almaty–Ust-Kamenogorsk road
    Preparation of design and cost-estimate documentation, including state expert review, 2008
  • Almaty Region: engineering geological surveys over an area of 150 ha in Uygur District
    Engineering geological surveys, 2008
  • Almaty Region: overhaul of the access road to Shamalgan village, km 0–2.3
    Preparation of design and cost-estimate documentation, including state expert review, 2008
  • Almaty Region: preparation of a feasibility study for the Almaty–Kapchagay road
    Engineering geological surveys, 2008
  • Republic of Kazakhstan: preparation of design and cost-estimate documentation for a connecting railway spur from Tamdy station to the planned cement plant in Karatau, and for the expansion of Tamdy station
    Engineering geodetic surveys, 2008
  • Republic of Kazakhstan: refinement of soil volumes by layer and as-built surveys for concealed-work certificates
    Topographic and geodetic works, 2008
  • Almaty Region: power supply for a crushing and screening complex in Fabrichny, Zhambyl District
    Topographic and geodetic surveys, 2007
  • Almaty Region: rehabilitation of the Almaty–Akmola road, Almaty–Gulshad section, km 343–509; defect rectification
    Engineering geodetic surveys, setting-out and georeferencing works, and preparation of design and cost-estimate documentation, 2007
  • Atyrau: engineering geological works on a 9.7 ha site on the right bank of the Ural River near Victory Park
    Engineering geological works, 2007
  • Atyrau Region: construction of four facilities in Karabatan
    Setting-out and georeferencing works and geodetic support, 2007
  • Almaty: construction of the Shakhristan residential complex on Navoi Street
    Setting-out and georeferencing works and geodetic support, 2007
  • South Kazakhstan Region: construction of the Client’s facilities at the Zapadny site of the Mynkuduk deposit
    Setting-out and georeferencing works and geodetic support, 2007
  • Construction of a cement plant in Akmola Region
    Setting-out and georeferencing works and geodetic support, 2007
  • Almaty: engineering geological works on a 19 ha site near Boralday, north of the gas-filling station
    Engineering geological works, 2007
  • Almaty: construction of the Solnechnaya Dolina residential complex
    Setting-out and georeferencing works and geodetic support, 2007
  • Kyzylorda Region: feasibility study for the restoration of the lake and canal system of the Zhanakorgan irrigation system
    Engineering geodetic surveys, 2007
  • Almaty: construction of the MegaTower residential complex, site 21
    Setting-out and georeferencing works and geodetic support, 2007
  • Almaty Region: preparation of design and cost-estimate documentation for the construction of a sports centre in the Ak-Karagay Valley
    Engineering geodetic surveys, 2007
  • Almaty Region: preparation of design and cost-estimate documentation for the construction of the Greater Almaty Ring Road
    Engineering geodetic surveys, 2007
  • Almaty Region: reconstruction design for the Almaty–Ust-Kamenogorsk road, km 118–188
    Engineering geological surveys, 2007
  • Almaty Region: construction in the Ak-Karagay Valley, Enbekshikazakh District
    Engineering geodetic surveys, 2007
  • Almaty: preparation of a detailed design for the overhaul of Ryskulov Street, from Akhrimenko Street to Zhangeldin Street
    Engineering geodetic surveys, 2006
  • Aktobe Region: topographic and geodetic control surveys for road construction
    Topographic and geodetic control, 2006
  • South Kazakhstan Region: setting-out and georeferencing works and geodetic support for the Client’s facilities under construction at the Zapadny site of the Mynkuduk deposit
    Setting-out and georeferencing works and geodetic support, 2006
  • Atyrau Region: overhaul of the Aktobe–Atyrau–Russian border national road, towards Astrakhan, km 504–512
    Design and survey works, 2006
  • Almaty: supply and transportation of crushed stone for the temporary camp and office structures
    Supply and transportation of crushed stone, 2006

Photographs from project sites

Drilling equipment at a work site, 2025

TOP GEO specialists, 2025

Tell us about your project