Engineering design
Design for subsoil development, industry, roads and civil construction
Design for your project
We develop design documentation for subsoil development, construction and reconstruction. We combine survey results with engineering solutions and support the approval process.
Working across Kazakhstan
Engineering and design solutions
Project support and approvals
Scope of work
Design for subsoil development
Exploration, mining and closure plans, with support for design implementation.
Construction and reconstruction
Design of industrial and civil facilities, roads and engineering infrastructure.
Project support
Approvals, technical and designer supervision.
Environmental documentation
Environmental protection solutions and environmental impact assessment.
How we work
A clear process at every stage
Discuss the task
We review the initial data and technical specification.
Prepare a proposal
We agree on the scope of work, timeframe and cost.
Carry out the work
We perform studies and engineering works.
Deliver the results
We provide reports and documentation.
Costs and timeframes are calculated against the technical specification
Work scope and project experience
Design disciplines:
Construction and reconstruction projects
Overhaul of transport infrastructure
Design of road bridges
Roads of every complexity category, including national, urban and settlement roads
Project support:
Approval of design documentation
Review by government authorities
Compliance with applicable legislation
Preparation of design and cost-estimate documentation:
Roads and bridge structures
Engineering networks and utilities
Industrial and civil facilities
Hydraulic structures
Transport infrastructure facilities
Types of design work:
Feasibility studies
Detailed planning projects
Detailed designs and working documentation
Cost estimates
Revision of design documentation
State expert review
Major design projects:
Road design and cost estimates for the Zhetysu poultry farm in Almaty Region (2024): KZT 26 million
Design and cost estimates for two road bridges over the Kurty and Zhirenaygyr rivers (2024): KZT 17.5 million
Detailed design of a residential complex in Pervomaysky District, Almaty (2024): KZT 41.7 million
Centre–East corridor, Pavlodar–Semey road, km 419–432 (2013): KZT 94.1 million
Road overhauls in Karkaralinsk (2022): KZT 20.5 million
18 km industrial access road to a cement plant (2013): KZT 5.5 million
Underground tunnel for transporting cement raw materials, km 406 (2009): KZT 2 million
What does your project need
Tell us about the site and expected scope. We will clarify the initial data, prepare an estimate and agree on the documents required for the next steps.
Design documentation
Tell us about your project
We will recommend a solution and prepare a proposal for your project