Road construction
Studies and engineering solutions based on your technical specification
Work scope and capabilities
Integrated services:
Reconstruction and overhaul of national, regional and district roads
Construction of new roads and access roads
Asphalt pavement repairs
Stormwater drainage construction
Bridge construction
Construction of pedestrian crossings, both overpasses and underpasses
Completed road projects:
Reconstruction of sections of the Almaty–Korday–Blagoveshchenka–Merke–Tashkent–Termez road:
km 261.5–310.5 (2012–2013): over KZT 43 million per month
km 310.5–358.6 (2010–2014): revision of design and cost estimates, KZT 23.6 million
km 358.6–389.4 (2014): revision of design and cost estimates, KZT 26.8 million
km 383–404 (2014): revision of design and cost estimates, KZT 13.2 million
km 443–483 (2010–2011): surveying works, over KZT 19 million per month
km 483–536 (2013–2014): surveying, KZT 38.5 million; quantity calculations, KZT 4 million
Reconstruction of the Russian border (towards Samara)–Shymkent road:
km 1398–1578 (2008): establishment of a geodetic network, KZT 6.7 million
km 1917–1948 (2014): revision of design and cost estimates, KZT 18.5 million
km 1980–2012 (2014): revision of design and cost estimates, KZT 15.9 million
km 2135–2183 (2011–2012): surveying works, KZT 29.5 million
Reconstruction of the Almaty–Kapshagay corridor, km 45–77 (2014): technical supervision, KZT 150.5 million
Reconstruction of the Astana–Pavlodar corridor, Pavlodar–Semey section, km 419–432 (2013–2015): design and cost estimates, KZT 94.1 million; designer supervision, KZT 10.1 million
Uzen–Turkmenistan border railway, Taigyr–Bolashak section (2009–2010): setting-out works, over KZT 45 million
Reconstruction of the Saryozek–Khorgos–Kogaly–Koksu–Karabulak road, km 58–94 (2013): technical supervision, KZT 8.4 million
Asphalt pavement and stormwater drainage repairs at the Institute of Nuclear Physics (2023): KZT 23.5 million
Street overhauls in Ayagoz (2013): surveys, KZT 7.8 million
Road overhauls in Karkaralinsk (2022):
K. Amanzholov Street, 5.5 km: design and cost estimates, KZT 14.2 million
T. Aubakirov Street: design and cost estimates, KZT 6.3 million; designer supervision (2024), KZT 18.1 million
Technical supervision of medium repairs on national roads (2022–2023):
R-23 Semey–Kaynar, km 47+500–51: KZT 7.2 million
A-11 Semey–Russian border, km 2+200–18: KZT 23.7 million
A-20 Karaganda–Ayagoz–Tarbagatay–Bugaz, km 747–757: KZT 20.5 million
A-8 Taskesken–Bakhty, km 166–181: KZT 17.7 million
M-38 Russian border–Maykapshagay, km 284–526: KZT 5.3 million
R-4 Nur-Sultan–Ereymentau–Shiderty, km 201.2–230.5: KZT 3.9 million
Road construction in Almaty (2009–2014):
Extension of Suyunbay Avenue from Sholokhov Street to Bekmakhanov Street with a flyover: technical supervision, KZT 62.1 million
Pedestrian overpasses on Sain Street: design and cost estimates, KZT 60 million
Overhaul of the Talgar road and Almaty–Kokpek–Chundzha–Koktal–Khorgos road: design and cost estimates, KZT 109.8 million
Street extensions: surveys, KZT 16 million
Road from Zhamakayev Street to Ospanov Street: design and cost estimates, KZT 16.6 million
Zhas Kanat neighbourhood, 7 km: design and cost estimates, KZT 49.1 million
Road in Novostroyka neighbourhood: design and cost estimates, KZT 13.9 million
Pedestrian underpass on Sain Street: design and cost estimates, KZT 7 million
Pedestrian overpasses: design and cost estimates, KZT 48.1 million
Tell us about your project
We will recommend a solution and prepare a proposal for your project